Biodesign Institute Building C Grand Opening

Biodesign Institute Building C Grand Opening

August 22, 2018

Address

797 E. Tyler St.
Tempe, AZ 85281

Location

Biodesign Institute, Building C

Date and Time

September 17, 2018, 9:30 am (Length: 2 hours 0 minutes)

iCal Download

The Biodesign Institute at ASU proudly pushes boundaries and discovers new answers to the world’s most challenging problems with nature-inspired solutions, like a diagnostic that more precisely detects breast cancer, a $1 “lab on a chip” that can be used to detect Zika in developing countries or a nanorobot that seeks and destroys a tumor’s blood supply.

Please join ASU President Michael M. Crow and our university community as we begin a new era of ideas, ingenuity and impact in our new Building C at the Biodesign Institute. See our new state-of-the-art research facility, visit with our amazing scientists and learn why we are building the world’s first compact X-ray laser.

Breakfast and refreshments will be served throughout the building.

Register